Skip to content

KNOWLEDGE HUB

Know the details before you commit.

Understand how materials, minimums, artwork, samples and quote terms shape the real cost and feasibility of custom manufacturing.

Blanks versus cut-and-sew

An existing garment with branding is not the same as a new pattern, fabric program or custom construction. MOQ, lead time and quality checks can differ.

Understanding MOQ

A minimum order quantity may apply per design, size, fabric, colour or production lot. A published general MOQ is not proof for your exact configuration.

Preparing artwork

A visual mockup differs from production-ready artwork. File dimensions, placement, colours, licensing and the agreed print process all matter.

Sampling before production

Reference, customized and pre-production samples answer different questions. Approving a sample does not remove the need for contract and production controls.

Reading a B2B quote

Check exact specification, quantity, taxes, logistics, delivery terms, validity, approval steps and the legal contracting seller.

Collections and consistency

Apparel, bags and packaging can share a design language while keeping separate suppliers, quality requirements, costs and shipments.